Showing posts with label green woodworking. Show all posts
Showing posts with label green woodworking. Show all posts

Tuesday, July 14, 2009

No crackers, Gromit! We've forgotten the crackers!

Some time during my third year of college, a friend of mine introduced me to Wallace and Gromit, claymation comedy from the U.K. It didn't quite meet up to the standards of Ren and Stimpy or the soon-to-be-released South Park, but it gave them a good run for their money. The lines Wallace had (especially about the cheese) were simply the best, though, and I wouldn't pass up the opportunity to watch a bit more if it came along.

But for now, I must placate myself by introducing you to a different Wallace. Fellow woodworkers and bloggers, meet my new Wallace 8" jointer...

This Delta-gray and slightly dusty machine comes to me by way of Craig's List, one of the best inventions of man since eBay. It wasn't necessarily what I would call a "steal", but for an 8" jointer, I think it was a pretty good price. Besides, I think the old adage that they don't make them like they used to can be most often applied to woodworking machines. This machine, coming from the late 1930's/early 1940's (most likely - I plan on researching it as much as possible in the coming weeks), is now my oldest, pushing my 1950 Rockwell Drill Press into second place.

Here's another way of looking at it... this is the epitome of "green woodworking"! I'm taking something that was made more than seventy years ago and renewing it and putting it to good use! So really, this is my way of doing my part to help save the planet.

It sits on a mobile base that originally came from a Delta 8" jointer. The previous owner (well, his dad, really) made some slight modifications to accommodate the Wallace. It seems quite comfortable there. The engine is not original - it is a Dayton 1hp single-phase (1725 RPM) motor. It is also not currently hooked up as I took these pictures after unloading it from the truck.

Due to work constraints, I wasn't able to get to the seller's house until some time after 7:00 PM this evening. So by the time we got it loaded, watched two B-1 stealth bombers fly a couple of routes overhead while making an appearance at the MLB All-Star Game, talked a bit about all of the old iron I saw around me, and finally made it back home, it was close to 9:00. While supper was cooking, I quickly ran outside to figure out the best way of getting the jointer and base from the back of the pickup without putting myself into the back of an ambulance.

In the end, I decided to take the mobile base out first and set it up. Then I could drop down the tailgate, push the base up to the gate, and slide the jointer off the gate and onto the base. It worked like a charm! It might have taken me less time to unload than it took to load!

The paint job looks good. The fence and beds seem to adjust properly.Hopefully, all I'll really need to do to get her back up and running at full speed is to sharpen the knives (or replace them).

I'll post an update or two as more information becomes available.

Thursday, May 7, 2009

My New Shop, Episode 3: Now It's Purple And Fluffy...

With a box to make, projects around the house, work, bird watching, and a whole lot of other things to keep me busy, I haven't been able to get back to working on the new workshop until this evening.

When we last left the shop, it was framed in and the electrical had been run for power and lights. It was ready for insulation. Earlier this week, I started looking for some because I had to put it in before my little brother helps me with the drywall this weekend. Turns out it was more difficult to find than I thought it would be...

Earlier this year, we had additional insulation blown into our attic spaces to try and cut a little more off of our cooling and heating costs. My wife, who works in the environmental field, was concerned about VOC's off-gassing from the formaldehyde used as a binder in most fiberglass insulation. After a few months of searching, we finally found a company who uses formaldehyde-free fiberglass insulation. Turns out their bid was very competitive, as well, so we went with them.

(Our budget billing has already dropped $10/month since then, by the way.)

After spending that much time and energy in putting a healthy insulation product into our attics, I thought it would be very silly to put regular fiberglass insulation in the basement (where the VOC's could rise through the rest of the house). So I started looking for any local companies who sold formaldehyde-free fiberglass insulation batting. After several hours of searching on-line, I finally found a company who specializes in the product, but they weren't exactly "local".

The brand name of the product I'm using is Johns Manville. They actively make and market insulation products that are better for your home environment. Unfortunately, there are only three places within fifty miles of my house that carried their products. The first one I called said they hadn't carried JM products in two years. One of the other two places was over in Illinois - not someplace I'd be going soon. That left Washington Lumber Supply in my home town of Washington, MO.

Having grown up there, I knew the store hours. It left me in a bit of a quandary, because I knew there was no way I could make it from work to the store before closing time.

Then I remembered I had two brothers still living in Washington.

(Duh.)

So I called my older brother and asked him if he could pick it up for me if I paid for it over the phone. He agreed. I called the store and placed my order.

The next day I drove down to my brother's house to pick up the insulation. In the process, I found out exactly how many bags of insulation I could fit in my Xterra and still see out the passenger-side window. (The answer is six, in case you are wondering; three bags of R19 and three bags of R13.)

It was a quiet ride home.

This evening, I went downstairs, sealed all of my duct work seams with HVAC foil tape, and installed the insulation.

It was hot and itchy and I had flashbacks of helping my brother finish his entire basement most of the time I was working on it. I was able to finish the ceiling in under two hours.

It had nothing to do with my calculations, but three bags of R-19 was just about the exact amount I needed. I was left with a total of four feet of ceiling still needing a little insulation by the time I'd finished.

Now my workshop is purple and fluffy. Not exactly the manly space I was looking for... I can't wait for this to be finished!

Well, I can't wait until I can paint those stupid walls, anyway.

I'm not going to insulate the newly-framed wall until we get drywall up on the inside, but I will insulate the areas around the steel I-beams and any other gaps in the ceiling before we close it up. I also picked up enough to insulate the only other interior wall (on the right in the first photo). I will do that from the other side before I hang some better quality peg board in the other room.

In the second picture, you can see the fluffy white insulation juxtaposed with the fluffy black Baby Teeters.

She spent a lot of time with me this evening. I don't know if she was more interested in what I was doing or in the Paul Simon CD I was playing. She gave us both a fair amount of attention. She is a wonderfully curious cat and managed to pick up one of the only bits of insulation I didn't sweep up. She doesn't photograph well from a distance in poor light, so you can barely see it on her chest...

This Saturday is the annual local plant sale sponsored by the Missouri Botanical Gardens via the Shaw Nature Reserve; Dana and I are going to go to that early in the morning. We will get back home before noon to meet up with my younger brother so we can hang some drywall.

Hopefully I'll have another shop update for you by Sunday!